QUALITY

home/quality

An essential component of Victor Metal Industries is quality. Victor Metal Industries’ foundation is mostly based on its quality policy. Our teamwork and personal dedication enable us to uphold our high standards as an ISO Certified manufacturer and supplier. In order to guarantee the quality of the finished products, we only employ the highest caliber raw materials from our most reliable suppliers. Every product is put through various tests and quality assurance procedures.

Our Excellence

  • We ensure the superior quality material is used to manufacture high quality ferrous and non-ferrous products.
  • Each raw material is going through various quality checks and standardization checks.
  • After manufacturing, every product is tested by a third party quality team and provides test certificates and reports.
  • We are continuously improving our quality policy to serve our customers better.

Quality Assurance Plan

Sr.No.Process OperationQuality CharacteristicsReliable Pipes and Tubes Ltd.hod Of Control
1Raw Material (Strip)1> Dimensions
2> Chemical analysis
3> Control of Slit which within specified limits
4> Surface
Actual measurement as per Std.
Analysis of all elements as per Std
Testing as per various Std.
Measurement of width, thickness & recording visual inspection.
2Tube Mill (GTAW Type)1> Weld Test, Flare Flanges, Flattering Reverse bend & Reverse Flattening.
2> Inspection of weld, seam
3> Dimensions
4> Surface
Testing as per ASTM specification & recording the result. One test for every 30 to 35 Mtrs. Visual inspection weld zone. O.D. , Thickness & Length.
Check roller surface profile& finish.
3Solutions Annealing (At Min. 1040 C)
With continuous water quenching.
1> Temperature
2> Hardness
3> MicroReliable Pipes and Tubes Ltd.er
Automatic Relay Temp / Controller Adjusted to present level. Measurement of hardness as per Std. one Test / Lot / Heat
4StraighteningStraightness OD Surface FinishAdjust roller setting measure visual
5CuttingSquare cut LengthRight angle to length, visual
6DeburingBurs removel On OD and ID EdgesVisual
7Chemical Treatment
a) Pickling
b) Passivation
c) Bath
Concentration
Concentration
Temperature
One Test / Bath Day
One Test / Bath Day
Temperature
8Hydrostatic Pressure TestTest Pressure100 % Inspection at test pressure specified as per ASTM Std.
9Final InspectionIGC Test Dimensions Surface Physical Testing
Grade Check
Product Analysis
As per standard 100 % inspection of Dimensions as specified.
Visual Inspection for surface defects, Physical Testing and Chemical analysis as per ASTM standards.
10MarketingMarking as per Std.Check for proper marking
11PackingSeaworphy Packing / Wooden CartCheck for packing, Quantity, shipping mark,